Thursday, August 1, 2013

Bunker Renovation- 14 Fairway

The first fairway bunker on the right side of 14 fairway was reconstructed. The front slope was lowered to allow long irons and hybrid shots to potentially reach the green.


Before slope was regraded


During the regrading process




Slope is regraded and forward fairway bunker (not pictured) has been filled in





Drainage installed



Sand added and the surrounds sodded 




Monday, March 25, 2013

Monday, March 4, 2013

Tree removal

The golf course is currently undergoing a tree removal project following the master plan set forth by

STEPHEN KAY • DOUG SMITH, GOLF COURSE DESIGN LLC

website:   http://kayandsmithdesign.com



A before view from the left side of the third fairway 




After the trees were removed, this is the view from the left side of the third fairway

Wednesday, January 30, 2013

Monday, January 28, 2013

1st Hole project

The left green side bunker was removed and the approach was widened and drainage was added during the fall and winter of 2012/2013.