Friday, October 25, 2013

16th Back Tee alignment / leveling


Sod removed from existing tee to be reused on the properly graded and leveled surface





Tee pad leveled and aimed towards the landing area of the fairway.



Tee oriented correctly 



Tee top almost completed


Just awaiting turf on the tee surrounds


Almost finished