Driving Range Tee Expansion



Stripping the sod from the existing 4200 square foot driving range tee.




After the top soil is stockpiled, the subsoil  is bulldozed to create a 10,500 square foot practice tee. 


Sub soil base is ready for the tee mix and top soil surrounds.


Building a form for the driving range artificial turf. Compacting crushed concrete and stone dust for a firm and level base for the mat.





Sod rolls being installed


Tee surface completed and being irrigated 


Checking the pitch of the drainage trench with a smart tool


Tee surrounds being sodded with turf type tall fescue



All done....... Great job by the Rossmoor Golf Course Maintenance staff.

Monday, October 20, 2014

5th Back Tee Expansion


Bentgrass sod being laid.




Nearing completion on the new 1000 square foot tee surface



Starting to sod the surrounds





Completed tee and surrounds

Wednesday, March 19, 2014

Storm Damage


Extensive wet snow combined with rain was too much for the majority of the white pines on the golf course.





Between the 2nd and 8th holes before the clean up. 





Between the 2nd and 8th holes after the clean up. 





Pro Stump tree service 
in conjunction with our staff cleaning up on the seventh hole. 

Friday, November 22, 2013

Bunker renovation on 13 & 14


Old sand removed from green side bunker on hole #14



Preparing to strip turf from the left green side bunker on hole #13



 Turf stripped from the left green side bunker on hole #13




 Old sand pushed up on right green side bunker on hole #13 to create a raised slope for a visible bunker from the fairway



Back tee on # 2


Preparing the site for a new tee. Adding subsoil and digging out a tree root 


Tee mix added for root zone 


Bent grass sod being laid 


Tee surround sodded 

Friday, October 25, 2013

16th Back Tee alignment / leveling


Sod removed from existing tee to be reused on the properly graded and leveled surface





Tee pad leveled and aimed towards the landing area of the fairway.



Tee oriented correctly 



Tee top almost completed


Just awaiting turf on the tee surrounds


Almost finished

Sunday, September 1, 2013

Renovation of the fairway bunker on the 13th hole


Bunker on # 13 fairway before renovation 


Bunker reduced in size and drainage added


Final grade and sand added to bunker 