Stripping the sod from the existing 4200 square foot driving range tee.
After the top soil is stockpiled, the subsoil is bulldozed to create a 10,500 square foot practice tee.
Sub soil base is ready for the tee mix and top soil surrounds.
Building a form for the driving range artificial turf. Compacting crushed concrete and stone dust for a firm and level base for the mat.
Sod rolls being installed
Tee surface completed and being irrigated
Checking the pitch of the drainage trench with a smart tool
Tee surrounds being sodded with turf type tall fescue
All done....... Great job by the Rossmoor Golf Course Maintenance staff.