Tuesday, November 4, 2014

Driving Range Tee Expansion



Stripping the sod from the existing 4200 square foot driving range tee.




After the top soil is stockpiled, the subsoil  is bulldozed to create a 10,500 square foot practice tee. 


Sub soil base is ready for the tee mix and top soil surrounds.


Building a form for the driving range artificial turf. Compacting crushed concrete and stone dust for a firm and level base for the mat.





Sod rolls being installed


Tee surface completed and being irrigated 


Checking the pitch of the drainage trench with a smart tool


Tee surrounds being sodded with turf type tall fescue



All done....... Great job by the Rossmoor Golf Course Maintenance staff.

Monday, October 20, 2014

5th Back Tee Expansion


Bentgrass sod being laid.




Nearing completion on the new 1000 square foot tee surface



Starting to sod the surrounds





Completed tee and surrounds

Wednesday, March 19, 2014

Storm Damage


Extensive wet snow combined with rain was too much for the majority of the white pines on the golf course.





Between the 2nd and 8th holes before the clean up. 





Between the 2nd and 8th holes after the clean up. 





Pro Stump tree service 
in conjunction with our staff cleaning up on the seventh hole.