Friday, November 22, 2013

Bunker renovation on 13 & 14


Old sand removed from green side bunker on hole #14



Preparing to strip turf from the left green side bunker on hole #13



 Turf stripped from the left green side bunker on hole #13




 Old sand pushed up on right green side bunker on hole #13 to create a raised slope for a visible bunker from the fairway



Back tee on # 2


Preparing the site for a new tee. Adding subsoil and digging out a tree root 


Tee mix added for root zone 


Bent grass sod being laid 


Tee surround sodded 

Friday, October 25, 2013

16th Back Tee alignment / leveling


Sod removed from existing tee to be reused on the properly graded and leveled surface





Tee pad leveled and aimed towards the landing area of the fairway.



Tee oriented correctly 



Tee top almost completed


Just awaiting turf on the tee surrounds


Almost finished

Sunday, September 1, 2013

Renovation of the fairway bunker on the 13th hole


Bunker on # 13 fairway before renovation 


Bunker reduced in size and drainage added


Final grade and sand added to bunker 


Final product


Thursday, August 1, 2013

Bunker Renovation- 14 Fairway

The first fairway bunker on the right side of 14 fairway was reconstructed. The front slope was lowered to allow long irons and hybrid shots to potentially reach the green.


Before slope was regraded


During the regrading process




Slope is regraded and forward fairway bunker (not pictured) has been filled in





Drainage installed



Sand added and the surrounds sodded 




Monday, March 25, 2013

Monday, March 4, 2013

Tree removal

The golf course is currently undergoing a tree removal project following the master plan set forth by

STEPHEN KAY • DOUG SMITH, GOLF COURSE DESIGN LLC

website:   http://kayandsmithdesign.com



A before view from the left side of the third fairway 




After the trees were removed, this is the view from the left side of the third fairway

Wednesday, January 30, 2013

Monday, January 28, 2013

1st Hole project

The left green side bunker was removed and the approach was widened and drainage was added during the fall and winter of 2012/2013.